Nurkholidah, Arta and Edi Rianto, ST., MT. and Hery inprasetyo, ST (2015) Analisa Waktu Baku Proses Fabrikasi Pipa di Divisi Kapal Niaga PT. XXX. Other thesis, Universitas Muhammadiyah Surabaya.
PDF (Pendahuluan)
Download (296kB) |
|
PDF (Bab 1)
Restricted to Repository staff only Download (131kB) |
|
PDF (Bab 2)
Restricted to Repository staff only Download (194kB) |
|
PDF (Bab 3)
Restricted to Repository staff only Download (570kB) |
|
PDF (bab 4)
Restricted to Repository staff only Download (564kB) |
|
PDF (Bab 5)
Download (9kB) |
|
PDF (Lampiran)
Download (249kB) |
Item Type: | Thesis (Other) |
---|---|
Subjects: | T Technology > T Technology (General) |
Divisions: | 08. Fakultas Teknik > Teknik Perkapalan 08. Fakultas Teknik > Teknik Perkapalan |
Depositing User: | Users 322 not found. |
Date Deposited: | 13 Nov 2017 07:47 |
Last Modified: | 13 Nov 2017 07:47 |
URI: | http://repository.um-surabaya.ac.id/id/eprint/632 |
Actions (login required)
View Item |