Nurkholidah, Arta and Edi Rianto, ST., MT. and Hery inprasetyo, ST (2015) Analisa Waktu Baku Proses Fabrikasi Pipa di Divisi Kapal Niaga PT. XXX. Other thesis, Universitas Muhammadiyah Surabaya.
![]() |
PDF (Pendahuluan)
Download (296kB) |
![]() |
PDF (Bab 1)
Restricted to Repository staff only Download (131kB) |
![]() |
PDF (Bab 2)
Restricted to Repository staff only Download (194kB) |
![]() |
PDF (Bab 3)
Restricted to Repository staff only Download (570kB) |
![]() |
PDF (bab 4)
Restricted to Repository staff only Download (564kB) |
![]() |
PDF (Bab 5)
Download (9kB) |
![]() |
PDF (Lampiran)
Download (249kB) |
Item Type: | Thesis (Other) |
---|---|
Subjects: | T Technology > T Technology (General) |
Divisions: | 08. Fakultas Teknik > Teknik Perkapalan 08. Fakultas Teknik > Teknik Perkapalan |
Depositing User: | Users 322 not found. |
Date Deposited: | 13 Nov 2017 07:47 |
Last Modified: | 13 Nov 2017 07:47 |
URI: | http://repository.um-surabaya.ac.id/id/eprint/632 |
Actions (login required)
![]() |
View Item |