Jump to:
C |
M |
P |
R |
SNumber of items: 7.
C
Cristiyan, Anton
(2021)
PERENCANAAN SISTEM DISTRIBUSI AIR BERSIH KECAMATAN MADURAN KABUPATEN LAMONGAN.
Undergraduate thesis, Universitas Muhammadiyah Surabaya.
M
MIRZA, ABDUL AZIZU
(2021)
ANALISIS KINERJA TINGKAT PELAYANAN TROTOAR PADA RUAS JALAN SURABAYA SELAMA PANDEMI COVID-19
(studi kasus : Jalan Kapasan Surabaya.
Undergraduate thesis, Universitas Muhammadiyah Surabaya.
P
PERMADI, INDRA
(2021)
IMPLEMENTASI KONSEP BUILDING INFORMATION MODELING PADA PERENCANAAN PENJADWALAN DAN BIAYA PROYEK PEMBANGUNAN GEDUNG RUMAH SAKIT LOMBOK DUA-DUA.
Undergraduate thesis, Universitas Muhammadiyah Surabaya.
R
RACHMAT, BASUKI
(2021)
PERENCANAAN STRUKTUR BAJA PADA BANGUNAN SEPULUH LANTAI DENGAN SISTEM RANGKA PEMIKUL MOMEN KHUSUS PADA PROYEK GEDUNG TELKOM SURABAYA.
Undergraduate thesis, Universitas Muhammadiyah Surabaya.
RINENGGA, AREZA
(2021)
ANALISA PENGGUNAAN PELAT KONVENSIONAL
DAN FLAT SLAB DENGAN DROP PANEL DARI SEGI EFISIENSI DI GEDUNG KANTOR
PT. PACINESIA CHEMICAL INDUSTRY.
Undergraduate thesis, Universitas Muhammadiyah Surabaya.
S
SETIAWAN, CANDRA
(2021)
PERENCANAAN STRUKTUR ATAS GEDUNG RUMAH SAKIT 10 LANTAI DENGAN SISTEM RANGKA PEMIKUL MOMEN MENENGAH (SRPMM).
Undergraduate thesis, Universitas Muhammadiyah Surabaya.
SURYASA , RIZAL AGUNG
(2021)
ANALISIS DURASI PROYEK PADA PEKERJAAN REKONTRUKSI APRON B DITERMINAL 2 BANDAR UDARA INTERNASIONAL JUANDA SURABAYA DENGAN MENGGUNAKAN SIMULASI MONTE CARLO.
Undergraduate thesis, Universitas Muhammadiyah Surabaya.
This list was generated on Sun May 28 07:21:47 2023 WIB.